Examples of improvement in production efficiency through CT effect
1




Overview of the equipment This is a semi-automated equipment which assembles and inspects the sensor mounted on to motor vehicles. When the switch is pressed by the worker,
(1) The work mounting surface moves inside
(2) The connector indents
(3) Inspection takes place
(4) The work mounting surface returns half way
(5) The inspection stamp will be sealed
(6) The work mounting surface returns to it's original position.
Specification of the equipment ● Total air cylinders in use = 8 units
● Product type compatibility = 10 types(compatible up to 25 types on 3 lines)
● Cycle time = 14.0 seconds





<Conditions>
1. The cost of equipment (1 unit) which use air cylinders・・・5 million JPY
2. The cost of equipment (1 unit) which use ROBO cylinders・・・5.5 million JPY
3. Labor cost (1 worker)・・・6.5 million/year